Vertical Xcelerator IP Guide de l'utilisateur Page 16

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 64
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 15
2-4 Assembling the IP Phone
Chapter 2 - Install & Connect the Phone
Xcelerator IP User Guide March 2007
Setting Up the Stand
Refer to the following steps and the associated illustration to setup the stand of the IP
phone.
Step A Move the big U-type frame (4) downward.
Step B Move the big U-type frame (4) downward to the flat level. The small U-
type frame (5) will get flat concurrently.
Step C Move the U-type leg (3) upward.
Step D Seat the U-type leg (3) onto the big U-type frame (4) at about a 30º
angle position.
-or-
Step E Pull-in the U-type leg (3) and seat it at about a 45º angle position in the
big U-type frame (4).
-or-
Step F Pull-in the U-type leg (3) and seat it at about 60º angle position in the big
U-type frame (4).
Vue de la page 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 63 64

Commentaires sur ces manuels

Pas de commentaire